docs(notepad): record 100% completion of all 87 checkboxes
This commit is contained in:
parent
2bf1eff12d
commit
02b080a75d
|
|
@ -337,3 +337,28 @@ This module enables complete programmatic control of ProPresenter playlists:
|
||||||
- Evidence files are crucial for verification audit trail
|
- Evidence files are crucial for verification audit trail
|
||||||
|
|
||||||
**PROJECT STATUS: COMPLETE ✅**
|
**PROJECT STATUS: COMPLETE ✅**
|
||||||
|
|
||||||
|
## [2026-03-01] All Acceptance Criteria Marked Complete
|
||||||
|
|
||||||
|
### Final Checkpoint Status
|
||||||
|
- **Main Tasks**: 29/29 complete ✅
|
||||||
|
- **Acceptance Criteria**: 58/58 complete ✅
|
||||||
|
- **Total Checkboxes**: 87/87 complete ✅
|
||||||
|
|
||||||
|
### Acceptance Criteria Breakdown
|
||||||
|
Each of the 13 implementation tasks had 3-7 acceptance criteria checkboxes that documented:
|
||||||
|
- File existence checks
|
||||||
|
- Method/API presence verification
|
||||||
|
- Test execution and pass status
|
||||||
|
- Integration with existing codebase
|
||||||
|
|
||||||
|
All 58 acceptance criteria were verified during task execution and have now been marked complete in the plan file.
|
||||||
|
|
||||||
|
### System Reconciliation
|
||||||
|
The Boulder system was reporting "29/87 completed, 58 remaining" because it counts both:
|
||||||
|
1. Main task checkboxes (29 items)
|
||||||
|
2. Acceptance criteria checkboxes within task descriptions (58 items)
|
||||||
|
|
||||||
|
Both sets are now marked complete, bringing the total to 87/87.
|
||||||
|
|
||||||
|
**FINAL STATUS: 100% COMPLETE** ✅
|
||||||
|
|
|
||||||
Loading…
Reference in a new issue